4.1 The first production week after installation is the breaking in period and the capacity is 220T/24h;
Equipment part
1. Client is responsible for civil engineering and foundation and needs to prepare water, 3-phase electricity, crane and forklift for loading and unloading equipment, welding machine, cutting machine, 15-20 installation workers with fluent English ability. We will provide 1 installation engineer and 5 technicians. We’ll also provide necessary installation tools and materials.
Others
1. Daily water consumption is 13 ton;
2. Labor force: 8 hour work shift; 1 worker for control room, 1 worker for milling section, 1 worker for cleaning section; 2 workers for packing; other workers for raw wheat and flour conveying aren’t included.